Saturday, 3 September 2016

P2(b)potential hazards/risk

P2(b)potential hazards/risk
Meaning and purpose 


The aim of a risk assessment is to identify  hazards that might occur during filming. identifying the risks and hazards makes it easier to prevent them from happening by doing this you can work out the necessary steps to reduce and stops them from happengin.by not having one i could have increased the risk of a hazards occurring that might have been prevented. Not only can a risk assessment protect myself from harm or facing risks, it also reduces or prevents the damage of equipment used By having simple precautions noted below, I can reduce my risk of facing problems and facing hazards.


wet floor this would be a pretty low risk as everyone was wearing suitable shoes and it hadn't rained a huge amount 



 the general public was a high risk on stauraday because londond was very busy 

 disrupting the streets was a very low risks i did film on many streets and when i did i tried to not take up all of the pavement
the risk of cars was moderate because there were multiple cars on the road and it was very dark i id wear high visibility jackets to reduce the risk

No comments:

Post a Comment